DRIVE · AUTOMATION · ROBOTICS

INITIALISING MISSION SYSTEMS00%
← Back to mission updates

Mission log // dispatch record

Design Complete: Rover Structure Ready for Manufacturing

After months of prototyping and iteration, the team has finalized the rover's structural design'optimised for strength, weight, and manufacturability. With designs signed off, parts will move to precision machining at Boehm Group in Zella-Mehlis. This milestone moves the project from CAD into physical production and assembly.

Field record // HSM Aries28 APR 2025 · Click image to expand

After months of brainstorming, prototyping, and multiple design iterations, our team has successfully finalized the rover's structural design. This marks a critical milestone, as every component has been carefully refined to balance strength, weight, and manufacturability.

With the design phase now complete, the rover is officially ready for fabrication at Boehm Group GmBHCompany in Zella-Mehlis, where industry-grade machining will bring our digital models to life. This transition from virtual design to physical production is a defining moment'turning concepts into real components that will form the backbone of our rover.

The final design reflects not only technical precision but also the collaborative spirit of our team, laying the groundwork for the next stage of manufacturing and assembly.